So am I Jo! What's left......I won't call it a ETC.....I know better
Tailstock clamp
Make clamp stud
Remake locking cam...current one doesn't have enough throw
Make the operating handle for the clamp
Fitting and aligning the tailstock
Alignment to the ways in two planes
Bring the center height .001" higher than HS center as checked with a mandrel held between centers.
Final check of alignment of the saddle, this time with Headstock as the Datum.
THAT SHOULD BE THE END OF THE SCRAPING!

Apron....do I need to shim the rack down?....
Leadscrew hangers probably need to be lowered
Need to make a mandrel to check leadscrew alignment
Need to make shims to lower the hangers.
Finish the control box.
wire up the motor and control box
Get a motor belt if I don't have one already....
Mount the motor
Repair damaged paint
Inspect alignments as outlined in the lathe build sheet
Drink beer!
With that we mark completion of phase 2 of this project. A running lathe! The rest is rebuilding of tooling items, but I won't consider that part of this thread. This thread will end once she's running If there is interest in the tooling items...I'll post them in another thread
I know there is interest in the milling attachment rebuild...and I haven't forgotten...but it will be another thread
.....Make Wallaby parts....

............I don't THINK I missed anything....but I probably did!..