Hi

I have had DRO's fitted to the X and Y axis of my X1 and X3 mills for some time now and they absolutely transform the machines, I wouldn't do without them. I would love to fit the better quality glass scales but they are well down the wish list at the moment. A DRO on the Z axis of the X3 mill would be a real bonus but with the column roughly 29" high a scale to fit is still a bit pricey. It occurred to me that when machining only a short amount of movement needs to be measured so a 6" scale and DRO found itself on Santa's xmas list.

I got one  :whoohoo:

This is how I'm attempting to fit it.

I found a length of C shaped alluminium that would make the vertical slide. I made up 2 pieces of steel machined to be a nice sliding fit in the channel. They are roughly 2" x 1" x 7/8". 2 holes are drilled and tapped 4mm 1" apart





Then counter bored with a 1/2" end mill.



2 pieces of 1/2" round brass about 3/32" thick make the pressure pads



A piece of flat steel strip sits between the 2 sliding pieces to fill the gap and the DRO is fixed to this with 2 4mm cap heads



Drill and tap 4mm at the base of the column.



Fit the alluminium channel with a cap head at the bottom and a large self tapper at the top with a suitable spacer





A couple of thumb screws made by knurling some 3/4" steel bar, drilling through 4mm then a counter bore the size of the cap head bolt on the reverse side.





Cross drill



And press in a roll pin



An alluminium bracket drilled 3mm and counter bored fits on the back of the DRO with the supplied screws



Heres a bit of video that explains what I'm trying to do

<a href="https://www.youtube.com/watch?v=W97YyDbBZA8" target="_blank">http://www.youtube.com/watch?v=W97YyDbBZA8</a>

Thats it so far

Cheers

Rich

Offline Don1966

  • Full Member
  • *****
  • Posts: 6855
  • Columbia, MS
Re: Fitting a vertical DRO to an X3 mill
« Reply #1 on: December 28, 2012, 07:24:40 pm »
Nice Job Rich I like it, makes is nice and simple and adjustable. I will be trying to put some on my new mill.

Don

Offline Firebird

  • Full Member
  • ****
  • Posts: 1337
  • East Midlands UK
Re: Fitting a vertical DRO to an X3 mill
« Reply #2 on: January 06, 2013, 04:39:12 pm »
Hi

Just a quick update, the new magnets arrived and they are powerful and should hold very well.





Cheers

Rich

Offline Firebird

  • Full Member
  • ****
  • Posts: 1337
  • East Midlands UK
Re: Fitting a vertical DRO to an X3 mill
« Reply #3 on: January 13, 2013, 02:13:55 pm »
Hi

Finished fitting the DRO, it works great.

A knurled knob with a 6mm thread and a spacer clamps the parts together.







The magnets are more than strong enough to hold but should break if I forget to undo the clamps.

Cheers

Rich

 