ddmckee54:
I was wrong, I wasn't done with the grey parts.... I forgot about the guide strips.  The guide strips keep the track links from rubbing on the top of the frame, and are finishing printing now.  I've done a test assembly of most of the heart of the beast - that would be the rotating assembly.  That went fairly well, there's only one spot where it's binding, but as I mess with it, that binding is going away.  When I first put it together, it would bind up every revolution, now I can give it a little flip and get a couple of revolutions before it stops. 

There's a fair amount of stuff in that assembly, and the clearance between the slew bearing outer race clamp ring and the upper frame center post is only 0.5mm.  I kept that clearance small to minimize the amount of crap that can get into the slew bearing.  The slew bearing is the only bearing on this beast that isn't either shielded or sealed.

This is the mostly complete rotating assembly. 

It's only mostly complete because I still need to install the connectors on the slip ring wires.  Once those connectors are installed I can tear the rotating assembly back apart, install the slip ring assembly in its' permanent home, and put the rotating assembly back together for what I hope will be the last time.  When I've got it torn apart I'll check to see if I can spot, and eliminate, what was causing the binding.  I suspect that there were a couple of printer boogers on the clamp ring and the center post for the upper frame that I missed when cleaning the parts.

Don


ddmckee54:
I wound printing the lift parts twice.  August was the last time I used the printer and I forgot that I didn't need to scale the parts before slicing anymore - so all the parts were too big the first time.   After a Homer Simpson moment. I took out the 103% scaling, re-sliced, and reprinted the parts.  I then discovered that I had an interference problem between the inner link and the outer link.  The inner link was hitting the edge of the outer link and not allowing the lift to fold completely shut.  After a minor re-design and re-print for the outer link I have what will eventually be the scissor hoist for the dump bed.  Below is the lift in its' folded configuration.

That's a AAA battery in front for a size reference. 


This is what the lift will look like when opened up.

That's a roll of 1" painter's tape that the lift is propped up against.  If my calculations are correct, this should give me almost 60 degrees of bed tilt.  That's an M4 x 55mm screw coming out of the gearbox, and my measurements show I only need about 12-15mm of travel from the lead-nut.  With the gear reduction I've got, that should mean about 30 seconds to lift or lower the bed.  I've still got to build the lead-nut assembly, but it's just going to be an M4 nut, some steel brake line, and a piece of brass for the pivot.

wagnmkr:
I just found this thread again ... how is the project going?

Tom