1..duplex feed pump.. block needs steam ports drilled, 3 main sections soldered as 1, pistons and shafts need to be made..
2.. boiler, boiler shell and burner unit,, plans drawn up,, almost all materials in hand,, several PM valve kits and pipe fitting sets waiting in boxes..
3. complete servo powered engineman..
4.. water tanks and hotwell tank..