Supporting > Boilers
Class 4 Boiler construction
Stuart:
no stew
it bend very easy just turn up a 5/8 dia bar with a 5/32 grove clamp and pull round with your hand its quite soft all bent up cold
with collars' ss on and clamped into the header with ptfe rings
as I said the header took some drilling and plugging to get it to function and look as the 12 to the foot one , its a lot of angled holes
for scale the boiler is about 20 inches long and heavy
Stuart
sbwhart:
Thanks for the info Stuart
Stew
Bearcar1:
WOW! Stuart, what a truly magnificent piece of work. You must be getting pretty good at silver soldering by mow.. :o ;D I'm looking forward to seeing the rest of your project.
BC1
Jim
Dan Rowe:
Stuart,
Wow indeed that superheater looks like the real deal. Very impressive work.
Dan
Stuart:
Thanks guys
as I have said before i build my loco's to true scale if the 12 to the foot has it the 1 1/16 to the has it
the loco if belongs to is about 4 foot long and is now to heavy to lift without the shop crane ( fixed on track above assembly bench )
I will take some more pics I do not detail my build the camera is to expensive to get near the machines like ?2k for the body and ?1K for the lens but i will take some of the static progress
I will get some pics of a vertical boiler I have done fully tarted up with up mahogany lagging
Stuart
Navigation
[0] Message Index
[*] Previous page
Go to full version