Engines > From Kits/Castings
2.5" Gauge Green Arrow Build
stevendavis:
Had some time to get a little work done on the Green Arrow. Got the crank pins hardened and locktited in. Wheels painted and one side of the axles locktited in. Still need to quarter the wheels.
stevendavis:
Plugged some numbers into Cad and this is what I think is right. The bottom line is my carrage surface on the lathe. I'll be quartering on the lathe between centers.
PaulR:
Those wheels look great when assembled :ThumbsUp:
stevendavis:
--- Quote from: PaulR on March 07, 2026, 07:41:22 PM ---Those wheels look great when assembled :ThumbsUp:
--- End quote ---
Thanks Paul.
Kim:
So, based on the drawing you attached, your quartering is actually thirding? 120 degrees?
And why are they all set to 120? Why is one 126 and one 114 degrees?
Very interesting,
Kim
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version