Welcome to ModelEngineMaker !If you have problems registering or logging in, please use the contact menu option to request assistance.
Hi Chris, I was wondering how you planned to drill the legs for the floor bolt bosses. The height of the parts and the shallow cutting angle struck me as potentially tricky. You obviously solved it perfectly, the cuts themselves look really great. Did you "drill" with an endmill on an extended shank?Parts and assembly look great, in any case.
OK....understood..... "Main Frame Anchor Bolts" Currently, you have the main pump frame base plate bolted down by 8 bolts then the wooden display border....would you consider a larger footprint display board with a 1" plus wide [on each of 4 sides] natural coloured fine concrete floor around the complete display base?All of the photographs display the concrete floor as the same grey tone as the pump & associated Could look the part DerekPS.....just found plain Brickwork floor in some images.....