I did it.
I done did it.
The deed is done.
I did the deed.
I ordered the machines today.
But
blast it...the lathe is on back order.
PM-25MV Mill should arrive next week.
PM-1030V Lathe will be another 5 to 8 weeks.
Got stands for both.
The Lathe comes with a QC tool post. Also a 5" 3-jaw and 4-jaw chuck, face plate, thread chasing dial, 4-way tool post, dead centers, and chip pan.
The Mill comes with stand, drawbar, and speed display.
I included a 3-axis DRO, collets, small vise, and clamping kit.
Pics of the shop's current status....
I managed to clear it out. T didn't want the cabinet anymore so I got it. It should make for a nice display case.
The two lab benches were won in a raffle at work when they changed out lab equipment.
I won one and my daughter won one. She has no place for it...so....
I'll use one for my electronic projects. The other will be general purpose.
Now I'm working on moving everything up from the basement.
It's going to be a while before I'm set.
My main desk and computer setup will be in the corner to the right of that cabinet.
Not very happy with the ceiling lights. I was somewhat misled. But...the benches have their own lighting and the plan always was to provide spot lighting.
Machines are going along the right wall between that chair and the windows.
That way I'm facing the wall that has the entry to the shop and should minimize my being startled by those people yelling at me to keep my exuberance down.
T doesn't like my setup. She thinks my desk should be near the windows so I can enjoy nature through the windows.
While I would certainly enjoy that...I don't want the outside light interfering with my computer.
Please pardon me while I
Having said that...and despite my being the kind of person that always seeks the bright side of things...
Will the machines arrive intact?
Will the machines arrive as expected?
Will I get the machines installed without breaking them or hurting me?
Yes...the story continues.