Welcome to ModelEngineMaker !If you have problems registering or logging in, please use the contact menu option to request assistance.
Thanks Chris and Kerrin.I am sure that you and most others realize that a lot of the track work was done before I started this thread. I was a bit nervous about the tracks as I had not done any before so I wanted to be sure that they were going to be OK before publishing. With the tracks debugged things are going to slow up a bunch.I cut a couple of sprockets on the laser for testig. Mounted them on shafts and clamped the shafts in a pair of vices.Here is an assembled track ready to start testing.
I did not mean to mislead any one. I had about a 3 week lead on the thread with the first week spent doing CAD work. The track parts went fairly fast as I coould do other chores between part changes on the CNC. Once I have a drawing I can program quite quickly and I do my designs to fit what the CNCs will do quickly and well. But now I will have a lot of manual operations and that will be painfully slow.Gail in NM