Another of the workshop projects to help get things all organised is a welding cart. This build started a while ago and has taken a back seat while the Lathe stand was completed and commissioned.
Current status is:
1. frame built
2. mounting plates for the wheels are drilled and welding in place with a successful trial fit of wheels done
3. bottle shelf has angle steel supports welded in place and a success trial fit of the gas bottle performed to prove the shelf is the correct width
4. bracing triangles to help hold the gas bottle in place designed and cut but work has gotten in the way of progressing those this week
See the pics below.
Pic 1: Over all view of the cart
Pic 2: The bottle shelf
Pic 3: The "crown" on the top shelf that will provide convenient places to loop earth and torch cables over